Dragon Crusher & Conveyor Belt Performance in Portugal

Step 01Project Narrative

Customer Situation & Initial Problem

Seasonal bogging and power bottlenecks under demanding French Atlantic rainfall

Armorique Sylviculture SARL manages over 1,400 hectares of municipal woodland, commercial pine plantations, and sensitive peatland conservation zones across Ille-et-Vilaine and Morbihan in Brittany. During the heavy Atlantic rainfall between October and March, ground-bearing capacity in their working areas drops significantly.

Their legacy wheeled tractor-mulcher setup frequently suffered severe traction loss, causing surface soil shear and deep rutting that triggered municipal environmental fines. More critically, the mechanical PTO drive line of their older carrier could not sustain continuous rotor RPM when tackling dense gorse and mature pine stumps, forcing operators to crawl at sub-economic speeds and causing repetitive hydraulic overheating cycles.

 
Step 02Project Narrative

First Contact & Requirements

Establishing technical thresholds: low ground pressure, high continuous hydraulic flow

In early August 2026, Technical Director Matthieu Tanguy reached out to the international export desk at GenG Greentech in the Netherlands. The brief was uncompromising: Armorique required an all-terrain carrier capable of carrying a heavy-duty fixed-tooth forestry flail, maintaining ground pressure under 0.35 bar, and delivering high auxiliary hydraulic flow without bogging down during peak winter harvesting.

Within 48 hours of initial consultation, GenG Greentech’s technical team compiled an engineering comparison dossier reviewing four tracked platforms, zeroing in on the specialized German-engineered Hörger tracked carrier with hydrostatic high-flow transmission.

 
Step 03Project Narrative

Demo / Site Visit

Hands-on evaluation and live hydraulic telemetry in the Netherlands

To ensure absolute certainty before committing to international capital expenditure, the contractor’s operations manager flew to Amsterdam Schiphol, where GenG Greentech arranged direct transfer to their testing yard in the Netherlands.

GenG Greentech had prepared the Hörger machine with real-time hydraulic flow telemetry meters connected to the auxiliary ports. Tanguy was able to operate the unit across simulated bog terrain and monitor pump pressures under 100% duty cycle. The dual-circuit variable displacement pump maintained a steady 285 L/min at 350 bar with zero hydraulic oil temperature spikes, confirming the machine’s cooling package was built for non-stop industrial forestry clearing.

 
Step 04Project Narrative

Machine Choice & Selection Rationale

Why the Hörger Specialized Platform outperformed standard crawler excavators

The decision to procure the Hörger specialized carrier rested on three decisive engineering factors: 1. Ground Pressure Optimization: Featuring wide 650mm rubber-steel hybrid tracks with an oscillating undercarriage, the Hörger distributes its 8.2-ton operating mass down to just 0.31 bar—well below the strict 0.35 bar French environmental threshold. 2. Hydrostatic Closed-Loop Rotor Drive: Unlike conventional mechanical PTO shafts prone to shock load breakage when striking granite boulders common in Brittany, the Hörger’s hydraulic relief valves dissipate impact spikes within 15 milliseconds. 3. Transport Versatility: With an overall width of 2.38 meters, the machine classifies within standard European road transport profiles without requiring costly exceptional convoy (Convoi Exceptionnel) permits in France.

 
Step 05Project Narrative

Workshop Inspection & Preparation in the Netherlands

120-point export certification, oil spectrometry, and bilingual cabin calibration

Before any machine leaves GenG Greentech’s Dutch export facility, it undergoes a mandatory 120-point workshop overhaul conducted by certified heavy equipment technicians. For Armorique Sylviculture, the Hörger underwent:

– Complete hydraulic oil sampling and lab spectrometry to verify zero metal particulates. – Installation of bio-degradable Panolin hydraulic fluid to comply with French Natura 2000 wetland environmental regulations. – Pre-delivery rewiring of the auxiliary quick-coupler manifold with flat-face leak-free couplings. – Calibration of the digital cabin display into French, including metric telemetry for rotor RPM, hydraulic temperature, and engine diagnostic alerts.

 
Step 06Project Narrative

Export Transport & Shipping Logistics

Turnkey European road logistics and customs clearance documentation

GenG Greentech managed the entire international export logistics chain door-to-door. Utilizing a specialized extendable low-bed semi-trailer with hydraulic loading ramps, the machine was lashed under DIN EN 12195-1 heavy haulage standards.

GenG Greentech’s export desk issued the full CMR consignment note, European Certificate of Conformity (CE), and complete French-language technical documentation. The 820-kilometer transit from the Netherlands across Belgium and Northern France to Brittany was completed in exactly 36 hours, with full GPS live tracking provided to the client’s phone.

 
Step 07Project Narrative

On-Site Delivery & Handover

Field commissioning in Rennes and operator technical briefing

Upon arrival at Armorique Sylviculture’s operational base near Rennes, GenG Greentech’s field logistics specialist coordinated the safe ramp discharge. Rather than a simple drop-off, a bilingual commissioning engineer was on-site for a full-day technical handover.

The training covered track tension maintenance, hydraulic relief valve monitoring, daily grease point mapping, and practical operation on an active pine stump clearing plot. Both primary operators completed hands-on cycles until rotor engagement and cabin monitoring procedures were second nature.

 
Step 08Project Narrative

Final Result & Measurable Impact

Zero wet-season downtime and a 65% reduction in ground remediation costs

Within the first 60 days of deployment in Brittany, the Hörger specialized carrier delivered concrete operational and financial returns for Armorique Sylviculture:

– Continuous Winter Operation: The contractor maintained 100% scheduled uptime through November and December rainfall, working on wetland sites that previously halted operations for up to 10 weeks annually. – Production Speed: Average clearing velocity on dense gorse and 25cm stump plots increased from 0.45 hectares per shift to 1.15 hectares per shift (+155% daily output). – Ground Remediation Savings: Low ground pressure eliminated deep rutting, saving the contractor an estimated €22,000 in mandatory post-mulching soil leveling and ditch restoration costs.

Beschikbaar ter overname 30.500 ex btw !!

🔧 Belangrijkste specificaties

📏 800 × 3271 × 1381 mm
⚖️ Gewicht: ± 1200 kg
🛠 Invoer: 400 × 205 mm
⚙️ Motor: Vanguard EFI 23 pk benzine
🧱 Output: instelbaar van 3 mm t/m 50 mm
⏱ Capaciteit: tot ± 8 ton/uur