Dragon Crusher & Conveyor Belt Performance in Portugal

Step 01Project Narrative

Customer Situation & Initial Problem

Seasonal bogging and power bottlenecks under conditions of heavy rainfall along the French Atlantic coast

Armorique Sylviculture SARL manages over 1,400 hectares of municipal woodland, commercial pine plantations and sensitive peatland conservation areas across Ille-et-Vilaine and Morbihan in Brittany. During the heavy Atlantic rainfall between October and March, the ground’s bearing capacity in their working areas drops significantly.

Their legacy wheeled tractor-mulcher setup frequently suffered severe loss of traction, causing surface soil shear and deep rutting, which led to municipal environmental fines. More critically, the mechanical PTO drive line of their older carrier was unable to maintain a continuous rotor RPM when tackling dense gorse and mature pine stumps, forcing operators to crawl at sub-economic speeds and causing repetitive cycles of hydraulic overheating.

 
Step 02Project Narrative

Initial Contact & Requirements

Establishing technical thresholds: low ground pressure, high continuous hydraulic flow

In early August 2026, Technical Director Matthieu Tanguy contacted the international export department at GenG Greentech in the Netherlands. The brief was uncompromising: Armorique required an all-terrain carrier capable of carrying a heavy-duty fixed-tooth forestry flail, maintaining ground pressure below 0.35 bar, and delivering high auxiliary hydraulic flow without getting bogged down during peak winter harvesting.

Within 48 hours of the initial consultation, GenG Greentech’s technical team compiled an engineering comparison report reviewing four tracked platforms, focusing on the specialised German-engineered Hörger tracked carrier with a hydrostatic high-flow transmission.

 
Step 03Project Narrative

Demo / Site Visit

Hands-on evaluation and live hydraulic telemetry in the Netherlands

To ensure absolute certainty before committing to international capital expenditure, the contractor’s operations manager flew to Amsterdam Schiphol, where GenG Greentech arranged direct transport to their test site in the Netherlands.

GenG Greentech had fitted the Hörger machine with real-time hydraulic flow telemetry meters connected to the auxiliary ports. Tanguy was able to operate the unit across simulated bog terrain and monitor pump pressures under the 100% duty cycle. The dual-circuit variable displacement pump maintained a steady 285 L/min at 350 bar with no spikes in hydraulic oil temperature, confirming that the machine’s cooling system was designed for non-stop industrial forestry clearing.

 
Step 04Project Narrative

Machine Choice and Selection Rationale

Why the Hörger Specialised Platform outperformed standard crawler excavators

The decision to procure the Hörger specialised carrier was based on three key engineering factors: 1. Ground Pressure Optimisation: Featuring wide 650mm rubber-steel hybrid tracks with an oscillating undercarriage, the Hörger distributes its 8.2-tonne operating mass to just 0.31 bar—well below the strict 0.35 bar French environmental threshold. 2. Hydrostatic Closed-Loop Rotor Drive: Unlike conventional mechanical PTO shafts, which are prone to breakage from shock loads when striking the granite boulders common in Brittany, the Hörger’s hydraulic relief valves dissipate impact spikes within 15 milliseconds. 3. Transport Versatility: With an overall width of 2.38 metres, the machine complies with standard European road transport dimensions and does not require costly ‘Convoi Exceptionnel’ permits in France.

 
Step 05Project Narrative

Inspection & Preparation Workshop in the Netherlands

120-point export certification, oil spectrometry and bilingual cabin calibration

Before any machine leaves GenG Greentech’s Dutch export facility, it undergoes a mandatory 120-point workshop overhaul carried out by certified heavy equipment technicians. For Armorique Sylviculture, the Hörger underwent:

– Comprehensive hydraulic oil sampling and laboratory spectrometry to verify the absence of metal particulates. – Installation of biodegradable Panolin hydraulic fluid to comply with French Natura 2000 wetland environmental regulations. – Pre-delivery rewiring of the auxiliary quick-coupler manifold with flat-face, leak-free couplings. – Calibration of the digital cab display to French specifications, including metric telemetry for rotor RPM, hydraulic temperature and engine diagnostic alerts.

 
Step 06Project Narrative

Export, Transport & Shipping Logistics

Turnkey European road logistics and customs clearance documentation

GenG Greentech managed the entire international door-to-door export logistics chain. Using a specialised, extendable low-bed semi-trailer fitted with hydraulic loading ramps, the machine was secured in accordance with the DIN EN 12195-1 heavy haulage standards.

GenG Greentech’s export desk issued the full CMR consignment note, the European Certificate of Conformity (CE), and the complete technical documentation in French. The 820-kilometre journey from the Netherlands through Belgium and northern France to Brittany was completed in exactly 36 hours, with full live GPS tracking provided to the client’s mobile phone.

 
Step 07Project Narrative

On-Site Delivery & Handover

Field commissioning in Rennes and technical briefing for operators

On arrival at Armorique Sylviculture’s operational base near Rennes, GenG Greentech’s field logistics specialist coordinated the safe unloading from the lorry. Rather than a simple drop-off, a bilingual commissioning engineer was on site for a full day’s technical handover.

The training covered track tension maintenance, hydraulic relief valve monitoring, daily grease point mapping, and practical operation on an active pine stump clearing site. Both lead operators completed hands-on training cycles until rotor engagement and cab monitoring procedures became second nature.

 
Step 08Project Narrative

Final Result & Measurable Impact

Zero downtime during the wet season and a 65% reduction in ground remediation costs

Within the first 60 days of deployment in Brittany, the Hörger specialised carrier delivered tangible operational and financial benefits for Armorique Sylviculture:

– Continuous Winter Operation: The contractor maintained the 100%’s scheduled uptime throughout November and December, despite the rainfall, whilst working on wetland sites where operations had previously been halted for up to 10 weeks each year. – Production Speed: The average clearing rate on dense gorse and 25cm stump plots increased from 0.45 hectares per shift to 1.15 hectares per shift (+155% daily output). – Ground Remediation Savings: Low ground pressure eliminated deep rutting, saving the contractor an estimated €22,000 in mandatory post-mulching soil levelling and ditch restoration costs.

Available for purchase: 30,500 excluding VAT!!

🔧 Key specifications

📏 800 × 3271 × 1381 mm
⚖️ Weight: ± 1200 kg
🛠 Input: 400 × 205 mm
⚙️ Engine: Vanguard EFI 23 hp petrol
🧱 Output: adjustable from 3 mm to 50 mm
⏱ Capacity: up to ± 8 tonnes/hour